Monday, April 22, 2013

Summing Up Harrah's Bets ...

Team,

I look forward to our final discussions on this matter as we look to write the next chapter of our organization. We've proven that our analysis and diligence into the matters of moving the company forward and separating ourselves from the competition to be successful, yet we have no time to rest amid this competitive and economic environment. Competition has been fast to adopt and innovate our proven strategies and customers have the ability to switch among entertainment venues easily all within a tough economic climate. These decisions will ultimately catapult Harrah's forward, ensuring we maintain our current stake as the 'chip leader' at the table. I believe the capital that was spent for the consulting team to further advise our team was well spent as they provided three plausible solutions for implementation.

It became apparent through our initial research and the consultants advice that a further upgrade and investment into our IT capabilities would prove prudent. Although past implementations and investments do not always predict future investments, our recent investments into our IT infrastructure provided a significant 62% ROI and shows strategic gambles given the proper analysis can be very successful. The upgrades to data mining and data analytic's would help enhance retention (+1%/year) as well as a reduction in costs and increased accuracy in targeting our most profitable customers. As I mentioned previously, these strategies would coincide with our initial insights into upgrading WINet to a more sophisticated system for analysis. Furthermore, I believe we should not only continue to upgrade our data mining capabilities, but also look to invest in our data collection and storage capabilities which will provide greater amounts of quality data for the upgrade system to run the advanced analytic's against. I encourage everyone to continue to reference back to the presentation deck in regards to the investments cost/benefit analysis. I thought the concept of the online concierge and reservation system was very interesting. This offering could be marketed as a luxury complimentary service to current or prospective customers, helping us move towards distinguishing Harrah's entertainment from competitor's offerings, all while helping advance our data management.

I look forward to everyone's final inputs at the next meeting,

Brian Grau

Reviewing Pandora

Team, 

The following are my thoughts in regards to the consultants presentations on the chief strategy we should deploy for moving Pandora forward in the coming years. It is important to note that the strategy we choose to adopt will have long-lasting if not definite consequences on the shape of our business. We have a number of opinions and interests to balance as well. I would commend the consultants on a job well-done as I believe they provided a wide range of options as well as their associated benefits and costs. After the presentation and greater analysis into our situation I believe the three-tiered approach would fit our organization the best while maximizing profitability and growth. 

As I mentioned prior to our meeting with the consulting group, I believe our situation is multifaceted and may not be able to be to be addressed through one single solution. After the meeting, I continue to feel this would be the best approach for moving Pandora forward into the next phase of it's operation. I do agree with the consultants opinions revolving around the use of social media and the option of selling Pandora. As our operation currently sits we have attracted millions of users and extensive popularity virtually without the use of any advertising and I believe an expensive advertising campaign into various social media outlets would provide mixed results. We need to be in the mindset of how can we have organizations advertise with Pandora rather than Pandora advertising through others. As long as we continue to provide an exceptional service while looking out for our customers than we will continue to succeed through Word Of Mouth marketing. Secondly, I never truly considered selling the organization as I believe our vision and service to our customers are not complete. I know some believe that Pandora has reached its pinnacle and moving on would be in our best interests, however I strongly disagree. 

The multifaceted approach that I pointed to prior to our meeting and then was further discussed by the consultants offers the greatest benefits both financially and strategically. Adopting options 2,3, and 4 would likely lead to revenues and synergies up to $20 Million in the first two years as presented. Introducing a mobile application, utilizing audio ads, and offering a tiered subscription would offer the greatest opportunity for revenues while not seriously jeopardizing current and prospective customers. Perhaps most importantly, we need to quickly move towards introducing a full-service mobile application for smartphones and other portable internet connected devices. Forecasts show the massive increase of smartphone users as well as hours dedicated to mobile applications over the next decade and we need to move to capitalize on these measures as many current and prospective customers will look to utilize the service through this method. Lastly, I would like note my endorsement of using audio ads to generate strong revenue streams, but while at the same time offering the customers the ability to choose and customize the levels of advertisements and data that is available through tiered subscriptions. Instituting minimal yet tailored audio clips to consumers based on their preferences will minimize disturbance for our customers while offering a unique proposition for advertisers. 

Thank you and I look forward to our discussions in regards to finalizing our strategy, 

Brian Grau 


Wednesday, April 17, 2013

Pandora Case Prep

Pandora's management team faced several difficult decisions to make just as the company seemed to be turning the road into profitability and substantial market share. One may believe that Pandora could simply stick to the model it's currently operating given the promising forecast of profitability and stability that the company has shown over the last several years; however with success also came opposing strategies to weigh and consider. Founder and creator of Pandora, Tim Westergren, had to balance competing interests, investor relations, profitability & growth, as well as his own visions and aspirations for the company. It became quite evident to Tim Westergren that the strategies he would enact would have an immediate and long-lasting impact on Pandora.

With currently over 8 million listeners, an online hour growth rate of 50% per year, and a business model that satisfies virtually endless customer segments, it was obvious Pandora was becoming a very successful company.  Ironically, however, even though Pandora was looking to turn the corner towards profitability, the company would actually be near cash-strapped into the next fiscal year given its current operations. Even while stepping down form the CEO position, Tim Westergren still desperately wanted to keep his vision of the live-streaming radio application alive, but still understood he had the interests of investors to consider as well as the need for cash to operate the company. Even though Pandora has proven their medal to advertisers through significant marketing and advertising metrics ($10-13 CPM) as well as millions of loyal customers, some investors doubted the ability of Pandora to leverage those opportunities and turn it into serious profits. Besides investors, Pandora had the threat of increasing royalties looming large, a potential increase that could pull the cash-stabbed business under. Pandora showed the strength of its following and loyalty of its customer base by the millions of letters that were petitioned against the royalty increase. Pandora faced a variety of strategies that could be chosen to generate added revenues such as increasing advertising on the service, seek new mediums and sources of data in regards to customers to increase its advertising value, or create a subscription fee for a premium or varying levels of service.

Possible Alternatives:

First, Pandora could consider moving forward in the direction of generating increased revenues through ads. An increase in on-screen advertising could help form strategic partnerships with varying advertisers (concert venues or affiliate retailers) while offering greater ad space, thus increasing revenues focusing on click trough’s, in turn generating greater revenue for Pandora. Given the proven metrics, Pandora could certainly attract potential advertisers with the increased ad availability; however it does come with certain consequences. Pandora's growth rate of subscribers would certainly slow given the word-of-mouth of increase of ads on the service  and could also possibly turn-off a portion of listeners who are looking for a service with strictly music. Pandora could optionally put in place a tiered advertising structure within this strategy. To limit potential backlash from the increase in advertising Pandora could offer the ability to customers to create more comprehensive customer profiles or greater feedback in terms of the music they were listening to. This feedback would in turn provide fewer ads to that particular customer in exchange for a greater amount of information on that customer. The increased demographic and preference information would then lead to more accurate radio service and increase targeted advertising for Pandora.

Pandora could also chose a variation of the first possible recommendation by increasing customer information, while not increasing ad space. At the time of sign up and periodically throughout the life of a customer using the service Pandora could seek additional valuable customer demographic and profile information. Pandora could limit potential backlash of these surveys by informing customers it is being enacted as a way to keep ads limited and the service free of charge. Currently, Pandora operates with relatively simple and basic customer information during profile creation and throughout its use, as well as basic information in regards to listener’s music preference (thumbs up or down). By enacting more comprehensive surveys, demographics and customer feedback on preferences Pandora could leverage that information from millions of consumers to increase advertising revenues as it currently operates. Even an increase of $2.00 (from 10-13 to 12-15 CPM) could result in a 20% increase of revenues.

Furthermore, Pandora could opt towards a balance of increasing advertising space while also offering a premium ad-free option to consumers. This option would certainly alienate certain customers, and would slow the rate of growth as well. At the same time to counteract this, Pandora would generate revenues through subscription fees as well as increased advertising. A $5/month premium subscription fee over 5 million users could generate upwards or $25 Million in additional revenues. This premium service would entail zero ad space on the accounts as well as an unlimited number of click-troughs on streaming songs. In this instance, Pandora would have to leverage its massive music library and brand name to attract as many subscriptions as possible.

Recommendation/Presentation:
There are seamlessly an endless number of strategies or combinations of strategies Pandora could deploy in order to balance the differing interests internally and externally. I believe it would be in Pandora’s greatest interest to move towards an increased ad-model while at the same time offering tiered subscriptions to limit or remove those advertisements depending on that customer’s specific preference. This would allow the customer to individually choose the levels of data and advertising they wish while factoring in subscriptions fees. I believe that the wealth of consumer knowledge, market share, and business model is put to waste if it is not leveraged as a fine line on advertising. Pandora must ensure that customers know that this decision is only being made for the viability of the music streaming service that is enjoyed by millions and every effort will be made to keep advertising and subscription fees as low as possible. As part of the presentation to the board I would also introduce the smaller-scale strategies of making the organization leaner by automating certain processes such as ‘music coding’ through a custom software package, thus in term shirking the employee base. Furthermore, Pandora could leverage the massive support and intrigue it receives from 'no-name' or up and coming artist looking to break onto the scene. Countless artists try and break through into their niche markets without a major record label by having their music displayed on Pandora. Without moving towards a major record status, Pandora could still leverage this support into revenues through 'placement-fees' by adding the artist’s music on the service as one of the few ways in reaching main-stream.

Tuesday, April 16, 2013

Harrah's Bet is Landing in the Black

The task at hand for Harrah's management team appeared to be a generic issue facing most organizations operating in today's marketplace; how to create a greater value for specific customer segments amid fierce competition and tight margins. Harrah's implemented an IT management system that saw its profits and market-share grow significantly beyond its competitors. Through a sophisticated IT system and custom analysis Harrah's was able to separate itself in a marketplace with thinning margins and intense competition by creating a greater understanding of their customer base and their specific needs. Harrah's management team was able to successfully integrate the comprehensive data streams of their customers across casinos throughout the nation to arrive at comprehensive and dynamic marketing programs designed for specific customer segments. As noted by senior management, Harrah's must not rest on its past successes as competitors are quickly adapting and leveraging much of the same technology and techniques Harrah's used to be so successful. Harrah's also has to compete with the continuing landscape of lavish mega-casinos that are looking to attract customers from numerous segments all to one central location.

Furthermore, Harrah's management team needed to further conjure similar methods for gaining market share and profitability across the country to grow the national. The casino and entertainment company has to seek unique ideas from current systems to capitalize on niche or untapped customer segments while at the same ensuring the ability to retain loyal customers in a volatile marketplace where consumers have low switching costs and numerous options.

It was evident that Harrah's had the variety and geographic footprint of their entertainment and casino locations to be successful in part to a rapid and dynamic expansion policy they had employed. Along with varying acquisitions, Harrah's also set out to be a first mover into new areas of legal gambling (I.e. riverboats & Indian reservations) to gain market share while providing offerings that would suit any taste. At the same time, many entertainment organizations were marketing and focusing on brand image on a local level, treating each location or casino as its own organization with specific marketing strategies. Harrah's went against the curve and took a single brand approach to be leveraged throughout each of its 21 locations. Harrah's believed that leveraging one brand and one overall marketing strategy concept would better able itself to capitalize and monetize the vast customer knowledge base that could be pulled in from each of its locations and analyzed through common methods. In order to create a national brand identity and customized marketing strategies that included reward programs and compensation packages to increase profitability of each customer, Harrah’s had to develop a sophisticated IT database management storage system that would allow them to analyze the trends and characteristics of current and potential customers. Queue up their Patron Database and Marketing Work Bench that in turn led to the ability to exploit closed-loop marketing. Harrah's was able to use analytics and marketing analysis on thousands of customer profiles among hundreds of attributes to derive custom marketing promotions and advertising that would hone in on specific targets. This helped provide insights into John Wannamaker's famous quote of "Half the money I spend on advertising is wasted; the trouble is I don't know which half" as it pertains to Harrah's. This quickly led to returns on the massive IT investment (62%) by increasing client retention, increasing customer loyalty, cross-market play, and marketing effectiveness. Other casino and entertainment organizations were quick to duplicate Harrah's strategy and the needed to innovate was needed in order to stay ahead of the curve.

In the face of this tough competition Harrah's could decide to pursue several strategies. First, they could decide to stick with the status quo that has made them so successful in the first place by capturing and analyzing customer data in the same manner they currently operate. A benefit of this strategy would be that it requires virtually no further investments in systems while also avoiding the risk that is involved with further investments, modifications, or upgrades to the system. While sticking with what made Harrah's successful in the first place, the company does run the risk of losing market share or being out-innovated by competitors. This alternative would ensure IT investments stay in check, but alternatively would minimize the amount of advanced analysis and metrics that could be used in furthering marketing strategies.

Management could also alternatively look to 'push the gas pedal' and further supplement its initial investments of their IT capabilities. In continuing to invest in their IT capabilities Harrah's could look to increase the data warehouse and storage capabilities, pursue additional upgrades to WINet and their Patron Database, as well as custom analytic programs/software for marketing effectiveness measurement. Most likely, these investments would be intermittent and periodic investments that are substantially less than the initial outlay for the system to be set in place while focusing on strategic small-scale improvements across all functions of the IT system. Not only could Harrah's focus on improvement to the storage and analysis of the data, but they could also look to invest in the data collection points throughout their value-chain and markets. A greater array of data from multiple sources (currently they operate mostly with data from reservations & gambling points) could enhance the statistical significance of the data, ensuring a greater representation of the target populations.

I believe the casino and entertainment giant should not rest on its current success as imitation in this market is ever-present and consumers have the ability to navigate to substitute offerings quickly and easily. The initial investment that turned a 62% return on investment, nearly doubled the stock price, and saw a 14% jump in same outlet revenue could actually be matched or outdone by competitors who make a similar investment in the customer-focused marketing strategy. By continuing to invest in areas such as data storage, customized marketing strategy analysis programs, and fine tuning applications and software such as the Marketing Workbench could lead to further development of a successful customer-focused marketing campaign that would keep Harrah’s on the cutting edge.

Thank you,

Brian Grau

Tuesday, April 2, 2013

Projecting 'Project's' Utility

Mr Goodman,

The following is my evaluation and considerations in regards to your request for an implementation evaluation of Microsoft Project as it pertains specifically to our organization. Microsoft Project is an increasingly popular software package that is being utilized throughout numerous Fortune 500 companies. MS Project is widely considered the dominant PC-based project management software that allows managers and employees alike develop project management plans and designs, evaluate and assign resources to their designated tasks, track progress, mange budgets, and much more.  The following is my evlaution of the software along with it's associated benefits and cost benefit analysis. After initial research, my recommendation is that Microsoft Project should be implemented and utilized within our data management and consulting orgnization.

As previously stated MS Project software allows project managers and team members in our organization to more seamlessly create and plan a project, collaborate with internal and external stakeholders of the project, as well as managing the critical resources that ensure it is completed within budget and on time. This will also lead to greater oversight of a project, greater visibility among those involved, and overall increase of communication. One of the greatest additions to MS Project 2010 was a greater integration of other MS Office applications that we currently utilize to a great degree, most importantly Excel. Several  prominant project managers note that Microsoft Project's greatest competitor was ironically Microsoft Excel, especially when it came to small-scale project management*. The integreation of Excel and other MS Office applications into MS Project 2010 will allow for a virtually seamless transition, as we currently operate with MS Suite 2010, minimizing a possible a learning curve due to the similar interfaces, as compared to other potential project mangement softwares. We currently utilize numerous Microsoft communication and collaboration tools such as Outlook and Lync and the addition of Project would further this integration and move towards one centralized source of communication and scheduling as it pertains to project managment. The addition of MS Lync to our Office Suite proved to be a highly successful implementation from a communication and collaboration standpoint (internally and externally with clients) as well as a significant costs savings measure.

Furthermore, the implementation of MS Project could be applied to numerous functions from HR management, operations and analytical framework consulting, to one of our largest segments, database creation and managment. The operations and consulting functions of the business are project intensive and the associated tools in MS Project such as Team Planner, Task Path (Gnatt charts), Resource Manager & Timeline Overview, are all processes our team leaders and project managers currently deploy in a less formal and less optimized fashion. If certain project managers prefer their proven, existing processes MS Project does offer customized management through Excel type databases and tools as well. I believe a very important aspect to consider is that a substantial portion of our operations and consulting employees work in varied locations, remotely, or on the road visiting clients. Project would allow the team members and managers who are located across the country to easily view schedules, timelines, resources, and communications to keep the project on track, which would be a valubale asset.

The costs do seem significant, at first glance, however a deeper dive into the potential cost savings and benefits point towards MS Project being a prudent investment. First, licensing fees for MS Project Standard are $589.89, however due to deep discounts when purchasing licenses in large quantities and our existing agreements with Microsoft we could see a reduction in license fees of up to 80% the retail price. The software would be first rolled out through our operations & consulting teams. These functions consist of approximately 3,500 employees. When taking into consideration licensing fees and a very short period of adaptation to the software (45/hour x 8 hours = 360 x 3,500 = $1.26 million) the investment costs would be $1.673 million.  As for cost savings, I believe the utilization of Project could result in conservatively a 2% reduction in costs among scheduling, communication, travel, and administrative processes within our "projects" budget. When this 2% is applied to a budget of 300 million in project management related costs it would result in a cost reduction of of $6 million per year. It is also important to note that this is a recurring costs savings whereas the licensing fees and learning curve are a one-time expenditure.

For the above stated reasons, most notably the returns in cost savings we would realize with the investment and the compatibilty of our organization to Microsoft Project I recommend moving forward with the decision to implement the software. I will be avaliable for further discussions on this possible implementation at your conveinance.

Thank you,

Brian Grau

Sunday, March 10, 2013

COBIT 5- Accenture Consultant follow-up


Team, 

As a follow up to our consultant meeting on the topic of a possible system implementation and upgrade to COBIT 5 I have the following thoughts before we move towards making a final decision. As stated in my initial pre-meeting notes and reiterated by the consultants, this is a major investment for our firm and is a significant decisions in regards of the future development and direction of our information technology systems. For several key reasons I still maintain the position that it is not the time for Accenture to go ahead with the implementation of COBIT 5 standards. 

It is important to remind ourselves the actual tangible benefit we could obtain versus the investment costs. When taking a closer look at the initial capital outlays plus future investments needed to maintain the COBIT 5 implementation I simply believe that the costs outweigh the benefits. My initial research provided insights into a total investment that could easily reach over $20 million, likely around $24 million. The consultants estimated an investment from 1.7MM to 2.3MM for 500 employees, which I believe is a conservative estimate. I also believe that training would be required for a much large number of employees than 500, likely closer to several thousand, as well as the likely possibility we would need to hire additional personnel. The consultants estimated an additional 15MM would likely be needed to fully support a several year implementation with additional personnel and training. I would also like to reiterate the loss of productivity costs that would occur while employees are removed from daily duties for training as well as the learning curve associated with its daily application, which could be one of the larger costs associated with the possible upgrade.

Secondly, as I wrote of in my initial insights we have set numerous industry standards and even best practices as a result of overhaul of our IT system from 2001-2008 and even through today. The consultants, who obviously are a third party hired to give an objective view of our practices and where we can improve stated a considerable number of areas where we are considered state-of-the art and contain a stable IT business structure to support the needs of the business. From this, we can infer that a number of the COBIT 5 standards have virtually already been set in place here at Accenture and would not yield a great advantage from where we currently stand. Furthermore, the current IT model we operate with is very complex and sophisticated while COBIT 5 offers more of a general model to create and operate an IT framework. COBIT 5 would likely have been a viable option before our complete overhaul as a foundation for our future IT framework, however with a complex IT system already in place I do not believe COBIT 5 standards are a specific fit for our business at the current time. I also believe that we need to strongly consider potential backlash from internal and external stakeholders who may not agree with the investment. I’m sure there are number of investors and employees internally who may not believe the investment is not needed at this time and the capital could make a greater strategic impact elsewhere. Internally, there are employees within the organization who have gone to great lengths while working very intensely to build our current framework that has yielded great success and moving in a different direction or making significant modifications could create turbulence within the firm.

For these stated reasons I believe that now is not the correct time for us to implement COBIT 5 standards here at Accenture. I do believe that COBIT 5 is a proven successful model to infer knowledge from as we move forward with further development and modifications with our IT infrastructure in the future. As we move forward towards a final decision I would like to garner your thoughts in regards to the consultant meeting and if anything has changed or was reaffirmed from your initial insights into COBIT 5.

Thank you,

Brian Grau

Thursday, March 7, 2013

Strategic IT Transformation at Accenture Consulting Lead In


Problem & Issue Statement: 

As Accenture implemented a state of the art and total overhaul of their information technology systems they quickly realized two things. First, the complete overhaul and ideology behind the path they chose for completing a complete transformation of the IT infrastructure, applications, suppliers, and software turned out to be extremely effective and successful. It's clear that very few organizations of that size could complete such a massive overhaul of their IT systems so quickly, dynamically, and completely. As an organization that genuinely believes and consults clients on simplifying processes and technology whenever possible, while also maintaining state-of-the-art industry leading technology and infrastructure this decision showed all current and prospective clients that Accenture truly believed in what they advise to its clients while setting an industry standard as it relates to IT infrastructure and transformation. Secondly, after solidifying and upgrading its IT systems, Accenture was strongly considering another upgrade to enhance its business standards & reporting as well as a total management of the business framework and enterprise systems. The framework software that Accenture was considering for the upgrade was COBIT 5. Even with a sophisticated IT system now in place Accenture had to consider its financial reporting systems among countless regulations across the globe. On top of regulations and compliance standards COBIT 5 could also possibly enhance Accenture's ability for their IT systems and applications to better communicate leading to greater integration, information access, and ultimately more sound business decisions. The IT overhaul of the IT system focused in on four key areas. These included: 1) redefining IT at Accenture from a cost center to an actual business model 2) reducing IT spending through an implementation of a web-enabled technology solution such as Microsoft or SAP 3) greater IT governance and oversight based on key strategic business objectives and lastly 4) a single-vendor/single-platform approach to software and applications eliminating the need for multiple suppliers while increasing buying power. COBIT 5 seeks to streamline these objectives through a detailed framework of best practices centered on a principles, polices, and framework ideology.

Plausible solutions & assessment: 

Accenture is ultimately considering two plausible solutions to the issue at hand; continue with the current IT framework and structure or implement COBIT 5 standards.

Continuing with their current IT framework and management system would ensure that Accenture would be maintaining the system that made them so successful from 2001 to today. When Accenture moved forward with the implementation of an upgraded IT system a number of key metrics improved across the organization. As a ratio to net revenue Accenture decreased IT spending by 58% (60% decrease of IT spend/employee) while nearly doubling revenues at the same time. Furthermore, local applications had been cut by 87% from the levels they were in 2001 before the upgrade while also maintaining high levels of satisfaction among employees internally and earning praise from external stakeholders. By choosing to forgo the COBIT 5 implementation and maintaining the status quo of their IT system, Accenture could continue to see their IT spending decrease dramatically, a functional or even exceptional level of integration as it currently operates, as well as the ability to continue the use of a decreased number of suppliers and applications needed to conduct business operations. Accenture could also continue to lean on their existing value chain and reporting systems that virtually revolve around the clock while ‘following the sun.’

Implementing COBIT 5 standards could result in several added benefits to their current IT system, but would also need a sizeable investment and change in current practices already in place. COBIT 5 has a number of similarities to their current IT model, with several practices that seem to overlap. COBIT 5 strives to create efficiencies, control, and flexibility in key IT areas such as plan & organize, acquire & implement, delivery & support, and monitor & evaluate. Within these areas or IT domains, COBIT 5 has proven outlines and best practices that can minimize unwarranted software’s and applications, link software and applications directly to business procedures and reporting, and an overall reduction of IT spending; among other benefits. It would be extremely important for Accenture to carefully identify each key benefit COBIT 5 has to offer and ensure that practice does not already exist within Accenture’s current framework. Implementing COBIT 5 involves a significant investment. A main cost structure for adopting COBIT 5 revolves around the training for employees which include costs of materials and in depth classroom setting training. The cost is roughly $175/employee for materials and another $1,500 for the two day class. Accenture would also need to consider other factors such as employee downtime and travel expenses. Conservatively, we could estimate the cost per employee who trains for COBIT 5 standards at roughly $2,500 each. Furthermore, there would be the time to implement and master the practices learned within the classroom and transfer them into every day practices at the office resulting in great loss of productivity. Even though everyone in the organization would not be subject to the training, an investment of at least $2,500 per employee across the IT function of thousands of employees is a significant investment.

Recommendation:

When fully considering the investment needed to adopt COBIT 5 standards along with its associated risk versus the tangible benefits Accenture could benefit from I believe it is not in the best interest of the organization to implement COBIT 5. With an investment that could exceed $20 million in costs, training, and loss of productivity as well as potential backlash from stakeholders that have taken a keen interest in Accenture’s industry standard IT systems and processes, the risk simply outweighs the net benefits that Accenture could utilize. Ultimately, even though COBIT 5 has industry-proven best practices and applications, Accenture’s current model already has in place a number of these practices and standards and implementing COBIT 5 would virtually duplicate existing measures already taken. For example, as previously stated COBIT 5 seeks to diminish replication among platforms, applications, and processes leading to decrease IT spending. This practice through the one-vendor and single-platform type approaches has been in place and has already streamlined processes and reduced costs significantly. COBIT 5 also seeks greater control over IT governance and control among regulations and standards however Accenture has these areas covered. They have put in place a series of controls such as project sponsors who see a project through all phases as well as a ROI auditing process that ensures accuracy and an upholding of standards and regulations. A number of further COBIT 5 standards were also covered through Accenture’s IT system overhaul such as linking IT processes to the objectives of the business through processes such as IT support on a per needs basis through an ‘internal customer’ and their need for the support. I believe that the upgrade is not warranted at this time as number of the key functions of COBIT 5 have already been in place since the overhaul in 2001. COBIT 5 provides keen insights into continually evolving our IT structure to consider as our business evolves over time, however the implementation given its investment is not a prudent choice at this time. 


Monday, March 4, 2013

Zara IT & POS Channel Reflective


Team, 

Overall great job in terms of preparation and attention to detail in regards to our meeting with the consultants last week. I believe the meeting with the consulting team created and developed a needed focus on the topic of our potential upgrade to our IT infrastructure and POS Channels within our outlets. There are a number of issues I would like for us to concentrate on and further discuss as we move forward towards our final decision. No matter the solution that we choose to move forward with I cannot stress the importance of this decision and the potential impacts (both positive and negative) that it could have on the immediate and future impact on our business and I hope each of will take considerable amount of time to consider the 'devil’s advocate' point of view with each of your decision factors.  

As I look back at the meeting there were a few surprises in regards to some of the content, although they confirmed much of the initial research and indicators I have seen. I felt as though the portion of the presentation regarding the various operating software’s we could consider was rather intriguing. The consultants provided a great deal of background into various OS's and custom application firms that we could consider if that route is chosen; all of which could be an asset in our future decision making. At times during the presentation I felt our team was questioning the validity to certain assumptions or subject expertise on certain criteria the consultants were covering, which is greatly encouraged, however it does show that perhaps we should take a moment of pause. Due to the size of the investment and the potential impact it has on our business model we need to consider every possibility and not have any lingering doubts or questions in regards to the decision. I enjoyed the manner in which the consultants presented the entirety of the situation and injected their previous working knowledge to add to their presentation as well. They were obviously advocating for us to move away from our DOS OS to a new system within Linux or Windows in a phased deployment along with an upgrade to our hardware and POS channels from a third party vendor. The consultants provided these arguments with solid cost analysis, switching costs, and vendors that we could move forward with given the decision. It would have been prudent for the consultants to offer greater detail in the possible decision to stay with our current systems and discuss the benefits and risks within that solution as well.

I, after further careful consideration, fundamentally disagree with a decision to upgrade from our current DOS OS and POS channels at this specific time. I believe that the potential risk we face is simply far greater than the possible benefits of the upgrade. As I mentioned prior to the consultant meeting, there is an inherited risk of maintaining our current systems moving forward into the future given our contractual issues with our main supplier of our hardware components.  I am also fully aware of the benefits the upgrade would bring in allowing our IT infrastructure & software to become up-to-date, almost state-of-the-art. Wireless networking, increased functionality in our handhelds, inter-store communication, actual and live inventory counts, sales information, and decrease transmission time and an increase in communication between our HQ and outlets are some of the features. All of these are great features to have within an IT system, however they do not provide a great deal of actual strategic growth for our firm. I look at this potential upgrade not in terms of future growth, but rather a hedge against the risk of a finite supply of our current hardware. These features described above are not necessities within our business model as we have shown through our tremendous growth into various markets using our current systems. We have been quoted ourselves are stating ‘close is good enough’ and ‘being too accurate is costly’ in regards to inventories. We flourish in a model that focuses on timely, market driven demands and quick turnarounds with little inventory back stock. It is not considered imperative to have our outlet staff monitoring exact details of stock or sending inventories within outlets; we need them on the floor selling!

I do however fully acknowledge the need to eventually upgrade our systems at some point in the future as I believe the capabilities and benefits associated with an upgrade will continue to grow and eventually outweigh the massive risk of employee and outlet down time resulting in possibly loss of sales in the millions. I believe this is a viable option to consider as an option to implement in the future given our predicament with our suppliers. At this current time I believe it is in within our best interest to exert our buying power and scale on our current suppliers to create a long-term contract to produce our current equipment as we are their largest customer.

I look forward to discussing this matter with the team in greater detail as we move towards a final decision.

Regards,

Brian Grau 

Sunday, March 3, 2013

Ubuntu Implementation


Good Evening Sir, 

As per your request for an evaluation of the Ubuntu operating system as well as the risks and benefits associated with a possible migration from Windows I have the provided the following assessment. Ubuntu is the world's largest Linux distribution, created in 2004 by Canonical, focusing on simplicity and frequent software updates. I would consider Ubuntu to be use-friendly software with a large amount of applications and a operating system interface similar to Windows. It comes with it's own versions of the most popular business applications similar to Window's Word, PowerPoint, etc, but not overwhelmingly different in nature. It has become evident that through initial research that Ubuntu does offer potential benefits that I believe our organization could utilize while also at the same time providing an inherited risk associated with the implementation. The key question is whether or not the benefits of the installation stack up to the amount of risk with making a complete switch the Ubuntu OS. Although Ubuntu is an interesting alternative to consider I believe the financial and opportunity or 'switching' costs outweigh the actual tangible benefits we could see in our bottom line. 

First, I believe it is important to note the financial impact the implementation could potentially have on the organization. At an initial glance it may appear there is a significant financial gain that could be made by moving from Windows OS (and its licensing fees) and its bevy of office applications to the open-sourced and free Ubuntu OS. However, we must be prudent and consider things such as sunk, opportunity, and switching costs. We analyzing our licensing fees with Microsoft for it's OS and office applications we can negotiate favorable bulk contracting prices due to the size of the licenses we are purchasing for installation on every computer across the organization. Currently as the most popular OS in the world, particularly in the home office and business sector, Microsoft enjoys the capability of virtually tying its operating system into nearly every PC and laptop sold through a variety of channels. Several manufactures do not sell PC’s or laptops without a pre-installed operating system (virtually always Windows OS). If we were to purchase Windows 7 OS ‘over the counter’ from an outlet or online retailer the average price is right around $95. Due to our licensing agreements and contract negotiation due to the size of the firm this price can be decreased up to 10%. Furthermore, purchasing a PC or laptop without an OS does not necessarily mean we will save 100% of the average Windows 7 OS price. The marginal savings of purchasing a computer for new employees without an operating software package would average $45-50. If the firm were to grow by 300 new employees this fiscal year we would save $15,00 in operating system costs. In terms of Microsoft office, current licenses of Office 365 Professional are being sold for roughly $400 ($400 X 200 = $80,000). When extrapolating these costs over time savings do multiply; however when compared to the overall risks they appear to be marginal, as well as the fact that we are considering utilizing Office Home 365 Premium which is only $99. It is important to note that there are certain upgrade and renewal fees associated with Microsoft licensing that Ubuntu currently does not charge. The cost of the Windows 7 already purchased or are contracted to be purchased are classified as sunk costs and cannot be recouped, and those sunk costs would be wasted if we were to move each PC or laptop to Ubuntu. Furthermore, we would need to consider that Microsoft does offer substantial tech and live-phone support for our employees given any issues or concerns with an application or software that Ubuntu does not offer. The migration towards Ubuntu would likely require formal training, although minimal, further depleting the cost savings with the switch. This would require an investment of classroom-type training for virtually all 30,000 global employees.

When further analyzing the benefits and risks of migrating to Ubuntu it is important to consider the switching and opportunity costs as well. These costs revolve around lost productivity of employees and the opportunity to pursue other projects or training in place of the switch the Ubuntu. When considering a loss of productivity measure we could fairly assume that overwhelming (if not all) of our employees could be considered as tech-savvy to moderate in terms of utilizing the functions of the operating system they currently use. To gain a strong understanding of the basic functions, locations, differences, features, and applications Ubuntu offers we could estimate each employee may lose on average 2.5 hours of productivity as compared to continuing the same workload on their current software. An average salary of $40/hour at 2.5 hours results in estimate productivity loss of $3 million across 30,000 global employees.

When considering the switch from Windows to Ubuntu it is extremely important to consider all of the costs and savings that apply. I believe that when examining the sunk and switching costs associated with the migration they outweigh the financial cost savings with the switch with a company of our size. Also, with so many client facings roles as we currently employee we would need to consider if there would be possible back lash from our clients that we present to and interface with on a daily basis in regards to switching from Windows. There is an intangible savings or value with continuing the use of a program that our employees are extremely comfortable working with and we run the risk of tremendous backlash internally with the switch on such a large scale. Lastly, and perhaps most importantly, even though Ubuntu does offer a number of benefits with the continual upgrades and overall simplicity, I do not see the actual benefit that would strategically drive our company forward in the future by moving away from an OS and applications that virtually every single one of customers and all of our employees use on a daily basis, when considering that the cost savings are marginal.

I look forward to discussing this matter in greater detail.

Regards,

Brian Grau

Wednesday, February 27, 2013

Zara IT & POS Channel Upgrade Consultant Lead In



Problem/Issue Statement:

As Xan Salgado Badas and Bruno Sanchez Ocampo discussed the future growth of Zara and the viability and sustainability of their current operating model they realized they had fundamental disagreements on the future of the current IT system in place at Zara. Zara operates the largest chain of stores within Inditex and is growing across Europe and other territories at the rate of one store per day so the IT system in place for POS channels and communication is vital to organization future success. Salgado, the head of IT for Zara and Sanchez, the lead for the POS system, disagreed on whether or not the current POS system and certain IT infrastructure needed to be replaced and updated. Salgado believes the investment needs to center around the current POS system along with a general upgrade in the IT infrastructure to enhance certain capabilities. Sanchez, however, believes the investment is not warranted at the current time as he believes the POS system provides the necessary information and capabilities for the continuing of Zara’s business model. The two men have a fundamental disagreement in the current state of the IT system in use. Salgado believes the company runs a great risk of falling behind the wave of technology using outdated systems, mainly with the suppliers of their hardware should they choose to stop manufacturing the terminal components. Furthermore, Salgado states his displeasure for the limited capabilities of the system as well as the lack of communication and analysis of certain data. Sanchez, however, trusts in the notion that if it is not broke, don’t fix it. He feels that the current operating model is satisfied with the IT systems in place and it has supported the tremendous growth to this point, so a large investment and the learning curve associated with the system is simply too large of an investment and risk.
It is important to note that although the current system has proven to be very reliable and it does currently satisfy the needs of the business model; the POS terminal application runs on DOS, an archaic system that is not supported by the major software suppliers such as Microsoft. Zara simply writes custom applications that run on DOS to date. Although the current suppliers of the hardware for the POS system have no plan of action to discontinue these parts, they also aren’t willing to be placed in a long-term contract for producing the hardware components. This leaves Zara in a vulnerable position if the supplier chooses to no longer produce the hardware, leaving them with a short, finite amount of hardware, which could limit future expansion for a period of time. Other issues besides the possibility of suppliers choosing to no longer produce the hardware and the archaic nature of DOS also reside in the capabilities of the application. For instance, employees cannot check real-time inventories or the inventories in nearby stores, while also spending excessive time on recording information manually into PDA’s and transferring that and other information to other hardware on one modem for transmission. It is also important to note that the POS system not only affects the individual store that would possibly upgrade its systems, but virtually the entire value chain for Zara. The POS system has certain interactions at nearly every level and impact on the overall business model so the investment is large as well is the risk.

Assessment of Issue:  

It is evident that Zara operates on a model that creates a competitive advantage through speed and adaptability. Zara has excelled at the challenge of not only staying up to date with current market trends of apparel, but also capitalizing on these trends by having that apparel on the shelves as quickly as possible. The company does not sell these clothes over their internet site, as it is for display purposes only, so sales through its outlets are the only transactions that occur. This further places an emphasis on having the correct inventories and correct apparel on the shelves within the least amount of time possible. Zara further complements this strategy by offering clothes that comply with current market trends and are not “classic” trends that may be around for longer periods of time. This ensures the company will release trends virtually on a bi-weekly basis while offering short periods of sale items as well limited inventories, all to encourage the customer to ‘buy now.’ Zara also intends its clothing to be worn a limited amount of times (roughly 10 times) before it is worn down or out of style. All of these factors push customers for quick and timely impulse buying patterns and often repeat customers. As mentioned above, Zara is opening outlets at the rate of one store per day, and they see great opportunities for expansion in certain markets, particularly Italy. As Zara looks to continuing expanding operations the IT system would presumably become more sophisticated as the need for greater communication becomes larger. As it presently operates, a Zara outlet could be opened (in terms of the POS channels) simply by installing several floppy disks with the POS and applications onto the hardware. Even if irregularities were presented or malfunctions in the installation a standard re-installation was fairly simple. This process limits the need for an expansive IT division. When considering the possible upgrade or IT systems as solutions Zara should keep in mind that it follows a track record and business model that says ‘close is good enough’ and being exactly precise is not necessary and often costly. This means a process that would increase the time of the flow of information, employee downtime, or trying to develop exact counts and analysis would relegate a competitive advantage they currently operate with. They also need to consider whether or not the actual investment, likely down time or learning curve of the upgrade is worth the potential loss of sales and the risk associated with switching from a proven process to a new system.

Possible Alternatives/ Solutions:

Solutions for the IT system at hand for Zara revolve around two main possibilities:

First, Zara could use the “if it’s not broken, don’t fix it” approach. This would obviously entail Zara moving forward with the current DOS Operating System with custom applications and the POS channels. As mentioned, the means Zara could continue without disrupting the model that has been proven to be very successful with no further investment to the current system, no learning curve, and no switching costs or risks associated with upgrading. The company, however, will run the risk of a limited source of components should the supplier choose to stop producing the hardware. Furthermore, they would continue to be limited in the actual capabilities that the system allows them to harness such as interaction between stores and visibility of actual inventories. They would continue to operate on the single modem model platform which to an effect could limit productivity due the lack of a wireless network and computer interaction. Should Zara choose to stay within this system it also creates the situation of whether or not they should invest in buying more hardware and components in case the supplier chooses to shut down those particular operations. This investment would ensure they would be sticking with the DOS platform for some time to come due to the capital investment and also would provide a future number of possible of sites with guaranteed start up hardware.

Secondly, Zara could push forward with the investment and the upgrade of the IT infrastructure as well as the current POS channels. This option provides the upside of potential new capabilities that could enhance productivity and interaction among outlets. This would most likely entail moving from the dated DOS platform to current software such as Windows, Linux, or Unix. Not only would certain POS channels be upgraded but an upgrade in equipment with wireless networking and computers would likely accompany the system. This could potentially increase productivity moving from the PDA to the functions of a computer. This would also allow for greater interaction among stores (for out of stocks, product transfers, or inquiries) as well as more exact inventory accounts for personnel.  This however does come at a sizeable investment financially. When considering programming for the OS switch (450 Euros/Day), POS channel upgrades, and labor for the physical upgrade (roughly 32 hours) the capital outlay is considerable. Perhaps more importantly than some of these capital outlays are the opportunity costs that accompany the upgrade. Due to the associated learning curve, fixing potential glitches in the new system, and employee training Zara could stand to lose millions in sales as a result of stores across Europe not being operationally for even a few days. Also, the familiarity associated with the current system with managers, employees, analysts, and manufactures has an inherited value that could be disrupted as well as create unwanted disturbance among those who are against switching from a proven process.

Recommendation:
It would be in my initial assessment that I would recommend that Zara currently forgo the investment and upgrade and stay with the current IT infrastructure. It appears that the capital investment and associated risk with the upgrade outweigh the limited benefits that accompany it. Although the store interaction, wireless networking, accurate inventory counts, and increased functionality of the upgraded equipment are beneficial features to have within an IT system, it is not necessary to have due to Zara’s business model. They have proven that the current model has not only been proven successful, but also shows signs of viability and sustainability in the future. I also believe working with the suppliers to persuade them into a long-term contract to produce the current hardware would be extremely beneficial for long-term security. Even if the contract does not come to fruition, Zara could look to make a small capital investment of components to be used in the Italy expansion of outlets in order to secure the systems sustainability for future growth. Zara may need to ultimately make the switch away from DOS and the current components towards Windows or Linux, but the investment is not needed at this time and can be ultimately decided upon once they receive confirmation the supply of the components is finite. Zara has thrived on the ‘close is good enough’ model, short product turnaround time, and limited inventories. The upgrade and its associated risk, learning curve, possible employee downtime and limited customer interaction at this particular time seem to outweigh the benefits of the upgrade.  


Friday, February 22, 2013

1-888-JUNK-Van Case Reflective

Team,

As a follow up to the business meeting with the consultants on the topic of upgrading our IT systems in order to stabilize our current business model while looking towards future, sustainable growth I have the following thoughts and considerations for our meeting tomorrow. As I discussed in my pre-consultation evaluation the consulting team described in detail each of the possible solutions to our current IT system that's in place; from Google Docs and custom applications to ERP and PaaS. It became quite evident to me that a number of the systems could be ruled out as possible solutions. When keeping in mind the most important characteristics of a system we would like to implement such as cost, flexibility, implementation time, vendor support, and very importantly minimizing the complexity of the IT system  it became evident that PaaS would be the most intriguing option for upgrade. We must consider the fact that although we are looking to grow the franchise we are still a small business operating in a unique business environment that does not require the implementation of a sophisticated and complex IT system that will need a large infrastructure and understanding to support and operate the application. I am ideally looking to put in place a system that can handle the business processes we currently operate with the flexibility for future adjustments, if needed. PaaS clearly satisfies these needs of the business while requiring minimal implementation time, competitive cost, and third part support and management. I have full faith this will correct out current information handling and data errors while creating the opportunity for management of the business to focus on growing our franchise, as well as other vital functions of the company. It would also be prudent to note that the system outlined by the consulting team as well as my initial research described PaaS as the desired solution, however the system actually follows the guidelines and characteristics of Software as a Service (SaaS), mainly because there is no physical hardware for the system on our end. I look forward to hearing all your thoughts and feedback from the meeting last night as well as any other immediate concerns to consider, such as the process of accounts receivable.

Thank you,

Brian Grau

Monday, February 18, 2013

1-888-JUNK-VAN Consultant Lead-In

Team,

As a precursor to our highly anticipated meeting with the consulting team this week, I would like to provide a review and assessment of the state of our business. Although I truly believe we have a proven and successful business model and optimistic future forecast, I do believe there are a series of legitimate holes in our business structure as it operates in the current environment. Without the correction of these issues, not only do we risk the future growth of the business, but we also risk the viability of the business as it currently operates. As an overview of our current business environment; it is clear the waste management industry has been through a cycle in terms of annual growth. From 2000-2009 the compound annual growth rate of 2.5% showed promise for the industry, however since then the industry has only grown by a CAGR of 0.6%. Promise is on the horizon however as experts believe the industry value will reach $276.4 billion by 2014 due to a CAGR of 3.9% over the next five years. Due to the nature of this industry, where clients largely consider the service a commodity, offering exceptional professional service at the lowest possible rates are imperative for the growth of the business. In order to offer exceptional professional service while also charging industry-low rates the business must excel in the areas of operational  efficiency and information processing. It has become evident the current state of our IT system, within the MS-Works database, is creating a situation that is producing an unacceptable number of information handling errors, database errors, and broken communications internally that is leading to poor customer service and the loss of current and potential clients. An array of possible solutions are available to upgrade or replace our current IT systems, each with potential strengths and drawbacks. It is most important that we put in place a system that will handle the business information accurately on a timely-basis and that could be implemented as quickly as possible. Several other characteristics of the potential system that are highly desirable include the complexity to handle our current business model while having the flexibility to change with the demands of the marketplace as well as vendor support to ensure the correct implementation now and in the future.

Using the following matrix I have provided an overview and assessment of the possible alternatives to our current IT system. As mentioned above it would be prudent for the team to assess each alternative with the most important characteristics we are looking for in the IT system as well as the applied risk and investment of each system. Lastly, we do not want to sacrifice the viability and sustainability of the future growth of the organization for short term profits and implementation.


As you can see from the evaluation matrix, given the general numerical scores I assessed to each solution, Platform as a Service (Paas) would be a solution with the greatest benefits to our business model. PaaS is similar to Google Docs in that the information is delivered on a cloud-computing infrastructure. This service hosts a bevy of potential benefits with few drawbacks. Users of the software could access the information and applications on demand from any connected device (using current laptops, smart phones, etc). This means utilizing common documents as well as the ability to build new unique applications, on a platform hosted by a third party. Based on initial research and demonstration trials from potential providers, it appears the forms and tables have a short learning-curve and implementation and data migration could be in place within three days. It also appears that Paas is gaining a great deal of momentum and endorsement from experts in the industry. The package is priced moderately at $300-$600 per month depending on variables such as the number of users and storage. Further customization, however, would require an increase in cost ($180/hour) and implementation time. Lastly, a nice feature is that the provider does not require long-term contracts, while offering various service levels and cancellation within one month. These features would allow us to mitigate our risk of the investment. Due to the numerous benefits stated above, as well as a lower risk associated with the investment than the other possible solutions, initial insights would point to implementing PaaS to upgrade our IT infrastructure.

Further analysis into utilizing MS Access, a custom built application software, Google Docs, and ERP as possible solution needs to be considered as they each offer unique benefits. It would also be prudent to learn more on the topic of hiring a dedicated IT worker to analyze, interpret, and distribute the company's data. This choice would likely be too expensive and may not be a long-term solution, however I would like to garner the thoughts from the consulting team.

Thank you and I look forward to the meeting on Tuesday,

Brian Grau